![]() |
![]()
General Power Rate Schedule GSA 1. Demand from 0 to 50 kW and kWh less than 15,000 Customer Charge: (*) $17.50
2. Demand from 51 kW to 1,000 kW or kWh Customer Charge: (*) $50.00
Energy Charge:
(Cents per kWh)
(*) Minimum Bill (No kWh)
3. Demand of 1000 kW or greater Customer Charge: $100.00
Energy Charge:
(kWh .04927)
Enhanced Growth Credit2 ways to qualify:
Division B: Mining 10 through 14, inclusive Division D: Manufacturing 20 through 39, inclusive Division E: 40 – Railroad Transportation 42 – Motor Freight Transportation and Warehousing 44 – Water Transportation 45 – Transportation by Air
a) the Customer’s space conditioning is accomplished solely by an all-electric heating, ventilating, and air conditioning system (HVAC system), b) at least fifty percent (50%) of the Customer’s interior floor space at that location is heated and cooled by the all-electric HVAC system, and c) at least fifty percent (50%) of the rated electric load served under the Power Supply Contract is for interior lighting, cooking, and the HVAC system 2 Options: The 8-year option pays $6 per kW each month the first year, reduced by $.75 per year for seven years and then ending. The 4-year option pays $6 per kW each month for four years and then ends.
Applies to businesses classified with a 2 digit Standard Industrial Classification (SIC) code between 20 and 39, inclusive. *Demand must be greater than 1,000 kW and less than 5,000 kW $1.38 credit per kW for first 1000 kW $1.63 credit per kW for 1001+ kW In addition, $.00540 credit for all kWh Example: Industry “A” used 2462.40 kW and 1,321,200 kWh this month 1000 kW x $1.38 = $1,380.00 1462.4 kW x $1.63 = $2,383.71 1,321,200 kWh x $.00540 = $7,134.48 TOTAL CREDIT $10,898.19
As a way of assisting commercial and industrial businesses locating in our service area, Tri-County Electric offers the Enhanced Security Deposit Program. Tri-County Electric will waive the required deposit for any business approved in the program (which can save the business several hundred dollars). In order to be submitted for approval, the business owner (or designee) will need to fill out the ESD application form and provide one banking and one trade reference. Once submitted, the approval process is generally completed in less than two weeks. The business will be required to pay the deposit if the meter needs to be set prior to receiving approval. This deposit will be refunded when the application has been approved.
|
|||||||||||||||||||||||||||||||||||||||||